Wall installation of the Classe 100V12E Tegui | Tutorial
How to install the Classe 100V12E on a wall
Video tutorial on surface installation of the Classe 100V12E monitor for compatible Tegui and BTicino video door entry systems.
Approximate duration: 2 minutes.
Before you begin
Identify the wiring and technology of the installation, disconnect the power supply when appropriate, and consult the technical documentation for the installed reference.
Recommendation: installation and connection must be carried out by qualified personnel, following the manufacturer's instructions and applicable regulations.